Delay Analysis In Construction Contracts by P. John Keane Hardback Book

₺5.490,00
+ ₺1.065,49 Kargo

Delay Analysis In Construction Contracts by P. John Keane Hardback Book

  • Marka: Unbranded

Delay Analysis In Construction Contracts by P. John Keane Hardback Book

  • Marka: Unbranded
Fiyat: ₺5.490,00
Satıcı:
₺5.490,00
+ ₺1.065,49 Kargo

Stokta kalan sadece 2

14 Günlük İade Politikası

Ödeme yöntemleri:

Tanım

Delay Analysis In Construction Contracts by P. John Keane Hardback Book

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.
  • Marka: Unbranded
  • Kategoriye Göre: İşletme, Finans & Hukuk
  • Biçim: Hardback
  • Dil: English
  • Yazar: P. John Keane
  • Sayfa Sayısı: 290
  • Yayıncı / Etiket: John Wiley & Sons
  • Fruugo Kimliği: 8131842-17439690
  • ISBN: 9781118631171

Teslimat ve İade

24 saat içinde kargoya verilir

  • STANDARD: ₺1.065,49 - Arasında teslimat Per 01 Ocak 2026–Cum 09 Ocak 2026

Kargo çıkış noktası Birleşik Krallık.

Sipariş ettiğiniz ürünlerin size bütün ve belirttiğiniz özelliklere göre teslim edilmesi için elimizden gelenin en iyisini yapıyoruz. Fakat, bütün gelmeyen veya siparişiniz ettiğinizden farklı çıkan bir ürünün elinize ulaşması ya da siparişinizden başka bir sebepten ötürü memnun kalmamanız durumunda, siparişi veya siparişe dahil ürünlerden herhangi birini iade edebilir ve ürünler için tam para iadesi alabilirsiniz. Tam iade politikasını görüntüle