A Multi-pass Construction Heuristic For The Aggregated Airlift Problem

₺949,00
+ ₺1.488,99 Kargo

A Multi-pass Construction Heuristic For The Aggregated Airlift Problem

Satıcı:

₺949,00

Stokta var
+ ₺1.488,99 Kargo

14 Günlük İade Politikası

Ödeme yöntemleri:


Ürün detayları

Ürün detayları

A Multi-pass Construction Heuristic For The Aggregated Airlift Problem

The Air Force Has Over 26,000 Airmen Deployed From Over 80 Military Installations To Forward Operating Locations (fols) In Over 21 Countries Providing Capabilities For Air Mobility And Refueling, Precision Strike, Close Air Support, Intelligence, Surveillance, And Reconnaissance Among Others. Airmen Are Rotated In And Out Of These Deployed Positions Every 120 Days As Part Of The Aef System. Prior To January 2005, Small Groups Of Deploying Personnel Made Their Way Via Ad Hoc Methods Providing Little To No Visibility To Planners And Creating A Backlog Of Personnel At The Points Of Debarkation (pods) Where Deploying Airmen Often Waited Up To 5 Days Before Receiving Tactical Airlift To Their Fols.this Work Has Been Selected By Scholars As Being Culturally Important, And Is Part Of The Knowledge Base Of Civilization As We Know It.
  • Fruugo Kimliği: 529166353-1074402278
  • ISBN: 9781249595250
Teslimat

Teslimat

24 saat içinde kargoya verilir

  • STANDARD: ₺1.488,99 - Arasında teslimat Çar 09 Aralık 2026–Çar 23 Aralık 2026

Kargo çıkış noktası Birleşik Krallık.

İadeler

İadeler

Sipariş ettiğiniz ürünlerin size bütün ve belirttiğiniz özelliklere göre teslim edilmesi için elimizden gelenin en iyisini yapıyoruz. Fakat, bütün gelmeyen veya siparişiniz ettiğinizden farklı çıkan bir ürünün elinize ulaşması ya da siparişinizden başka bir sebepten ötürü memnun kalmamanız durumunda, siparişi veya siparişe dahil ürünlerden herhangi birini iade edebilir ve ürünler için tam para iadesi alabilirsiniz.

Tam iade politikasını görüntüle